A renovated bathroom beside a Foreman status card: waterproofing approved, tiling fix requested, payment on hold while Foreman follows up with the trade

The renovation you want — without the risk and hassle.

Foreman is the independent expert on your renovation. We check every trade's work against the National Construction Code and only release payment once it's right. You get the renovation you were promised — without managing any of it.

Peace of mind, start to finishA trusted partner in your corner from the first quote to the final sign-off.
Independent inspectionsEvery stage checked on site against the National Construction Code — by us, not the trade who did the work.
Use any trade you likeAlready have a builder or tiler lined up? Keep them — Foreman works alongside whoever you hire.

Why Foreman?

A bathroom cut away to show the hidden layers behind the tiles: copper pipes and framing, waterproof membrane and adhesive
01

The quality is all in what you can't see

Footings, framing, wiring, plumbing, waterproofing — the work that decides whether it lasts gets covered up. If it's wrong, it shows up years later as leaks or cracks, and fixing it means ripping out finished work at many times the cost. Foreman checks each stage before it's covered, so problems are caught while they're cheap to fix.

A warranty certificate torn in two through its seal
02

A warranty you can't actually claim

Trade warranties usually last only a few years — far less time than you'll own the home — and product guarantees only hold if the work was installed to the maker's specification. Foreman records every stage, giving you the proof to claim and a record that stays with the home.

A stage payment card marked paid
03

Don't pay before you know it's right

Today, stage payments go out long before anyone knows the work was done properly — and by the time you find out, the money's spent. With Foreman, you only pay once each stage has been checked and passed.

Verification

Work verified.
Before payment.

A clear check of each agreed stage, backed by evidence you can see.

  • Evidence captured at the right timePhotos and measurements record the work as it happens — including the stages that get covered up.
  • Checked against the requirementsEach agreed stage is reviewed against the National Construction Code, the relevant Australian Standards and the product maker's installation instructions. You see what was checked, what passed and what needs attention.
  • Disputes managed by ForemanIf something falls short, we raise it with your trade and manage it through to a fix. You never have to step in or argue it out.
  • Payment released once verifiedWhen the stage passes, your trade is paid. Until then, your money stays on hold.
A bathroom cut away to show the pipes, waterproofing and adhesive behind the tiles, beside a phone showing the work verification: the shower fixture is marked verified, the grout is flagged for review, and the evidence is captured
Illustrative verification view. Evidence is captured as work progresses.
Issues handled for you

You keep the relationship.
We handle the hard conversations.

If something isn't right, you never have to be the one to raise it. We take it up with your trade, bring the evidence, manage the back-and-forth and see it through to a fix. No awkward conversations, no arguments on site, no stress — and you stay on good terms with the people working in your home.

An example issue: a grout problem is raised with the trade, their response is recorded and the fix is verified while the payment waits.
Example issue journey: flagged, followed up and checked again.
  1. 01We raise the issue clearlyYour trade receives the photos, the relevant requirement and a clear explanation of what needs attention.
  2. 02We follow up with your tradeQuestions, responses and agreed next steps stay together. You can see what's happening without chasing every update.
  3. 03We check the fixUpdated evidence is reviewed before the stage is approved for payment. You keep the record of the issue and its resolution.

If there's a disagreement, we help both sides work through the evidence and document the next steps.

How Foreman works

  1. A phone showing the bathroom renovation project plan: preparation done, waterproofing and tiling to come
    1

    Project plan created

    Agree on the plan.
    Your trade gets started.

  2. A Foreman inspector checking a bathroom cut away to show the pipes and waterproofing, each stage ticked as verified
    2

    We check the work

    We inspect each stage on site.
    Evidence is captured and verified.

  3. A card reading Payment sent
    3

    Your trade gets paid

    Once verified and approved,
    the stage payment is released.

Something needs fixing? We follow up with your trade before payment.

Get on the Foreman waitlist

We're onboarding a first group of home renovators and trades later this year. Tell us which you are and we'll be in touch before we open up.

No spam. One email when we open your area.